Factory Engineering & Equipment

PRIMARY SERVICE · FACTORY PLANNING & CLEANROOM FIT-OUT

Factory planning
to cleanroom handover.

Coordinate factory planning, cleanroom fit-out and equipment interfaces around your process. A 30-day execution window may apply to eligible fit-out scope after entry conditions are confirmed; the wider factory project follows its own agreed schedule.

Explore the project path ↗
PARENT-COMPANY ENGINEERING REFERENCEPARENT-COMPANY ENGINEERING REFERENCE

SOLUTION CATALOGUE

Four routes for the full customer brief.

The factory-planning route leads the V2 business priority; the three customer-requested production-line routes remain available for food, cosmetic and grooming projects.

01 · OVERALL PROJECT MODEL

One factory project, six connected decisions.

The overall project is planned as a connected path. It does not share one fixed duration: equipment manufacturing, shipping, local permits and third-party work follow their own confirmed schedules.

  1. 01

    Requirement definition

    Site, product, capacity, market and investment boundary.

  2. 02

    Planning & design

    Process layout, cleanroom zoning, people and material flow, utilities.

  3. 03

    Scope confirmation

    Drawings, quotation, interfaces, responsibilities and schedule baseline.

  4. 04

    Fit-out execution

    Mobilisation, cleanroom construction, system installation and records.

  5. 05

    Equipment integration

    Manufacturing and shipping coordination, utilities and installation interfaces.

  6. 06

    Commissioning & handover

    System checks, training, open-item closure and written handover.

30DAYS

02 · STANDARD CLEANROOM FIT-OUT PROGRAMME

A clear execution window after the project is ready to start.

This is a planning framework for eligible standard cleanroom fit-out scope, not an unconditional completion guarantee for the entire factory project. Applicability is confirmed after site and scope review.

Programme entry conditionsDesign frozenSite handed overMaterials confirmedResponsibilities signed off
  1. 00

    Before Day 0

    Entry conditions confirmed

    Design frozen, site formally handed over, agreed materials available and the responsibility matrix signed.
  2. 01

    Day 1–7

    Mobilisation & base works

    Site set-up, setting-out, base preparation and material organisation under the approved plan.
  3. 02

    Day 8–20

    Cleanroom systems installation

    Enclosure, HVAC, electrical and agreed cleanroom systems advance in coordinated work fronts.
  4. 03

    Day 21–27

    Interfaces, finishes & commissioning

    Complete agreed interfaces and finishes, then conduct internal checks and system commissioning.
  5. 04

    Day 28–30

    Inspection, correction & fit-out handover

    Joint inspection, agreed corrections, record collation and cleanroom fit-out handover.
Outside the 30-day fit-out window

Equipment manufacturing · international shipping and customs · permits and authority approvals · third-party testing / certification · customer changes or delayed decisions · conditions not disclosed before scope confirmation

03 · STANDARD DELIVERABLES

Delivery means documents and decisions, not only a finished space.

The final document index follows the signed scope. The groups below define the standard project information architecture and make omissions visible before handover.

01

Planning & design

  • Requirement brief
  • Concept layout and room schedule
  • People, material and process flow
02

Construction package

  • Confirmed drawing index
  • Material / equipment schedule
  • Construction and progress records
03

Equipment interfaces

  • Utility condition schedule
  • Installation interface checklist
  • Equipment layout coordination
04

Project management

  • Responsibility matrix
  • Change and issue register
  • Meeting and confirmation records
05

Handover package

  • Inspection and correction list
  • Training / commissioning records
  • Handover document index
06

Compliance coordination

  • Testing preparation materials
  • Filing / audit coordination list
  • Third-party document register

04 · SERVICE STANDARD

Support before, during and after delivery.

Service depth, on-site attendance, response arrangements and any warranty terms are confirmed in the quotation and contract instead of being assumed on this page.

01PRE-SALES

Turn the brief into a workable boundary.

  • Requirement workshop
  • Site information review
  • Concept and budget discussion
  • Risk and dependency identification
02DELIVERY

Keep design, site and interfaces aligned.

  • Drawing and scope coordination
  • Progress and quality records
  • Change and issue tracking
  • Handover preparation
03AFTER-SALES

Support the agreed systems after handover.

  • Operating guidance
  • Remote issue coordination
  • Maintenance and spare-parts discussion
  • Follow-up service by quotation

05 · RESPONSIBILITY MATRIX

A reliable schedule starts with clear ownership.

The matrix below is a discussion baseline. The signed project responsibility matrix and local requirements govern final ownership.

WorkstreamZhongyiClientThird party
Design inputs & approvalsPrepare proposals and coordinate agreed design outputs.Provide accurate requirements and approve decisions on time.Review or approve where local authority input is required.
Site readinessIssue agreed entry-condition checklist and interface needs.Provide lawful access, base conditions, utilities and site cooperation.Property, utility or local contractors support as applicable.
Fit-out executionDeliver the signed cleanroom fit-out scope and project records.Provide decisions, access and acceptance participation.Statutory inspection where required.
Equipment, logistics & customsCoordinate contracted equipment and installation interfaces.Confirm specifications, consignee data and import arrangements.Carrier, customs broker and authorities complete external procedures.
Testing, filing & auditsPrepare agreed technical materials and coordinate interfaces.Provide samples, legal entity documents and required applications.Appointed bodies perform testing, review and issue conclusions.
Changes & acceptanceRecord impacts and execute approved changes within scope.Approve cost / schedule impacts and complete acceptance.Independent sign-off when specified by contract or regulation.

SCOPE NOTICE

The 30-day programme is confirmed per project.

Final scope, dates, deliverables, acceptance criteria and service obligations are governed by the signed proposal, responsibility matrix and project schedule. Testing, filing, certification and authority approvals are coordination activities and do not imply a guaranteed outcome.

Check programme applicability ↗

NEXT STEP

Start with your site, scope and target handover.

Review the connected factory project path with our team.

Start your factory project ↗
WhatsAppHOME